░░░░░░ Login to view SqFt Gross Colocation Size
Show SqMNPA-NXX: 847-787
Phase I commissioned in 2008
Phase II commissioned in 2011
Distance | Site | About |
---|---|---|
0.00 miles | Digital Elk Grove Village Campus |
Digital Realty Trust's Chicago campus is massive and is split among 3 buildings. The campus was acquired from Dupont Fabros in September 2017.
|
0.00 miles | ServerCentral CH1 |
|
0.02 miles | Rackspace Elk Grove ORD1 | |
0.02 miles | 2200 Busse Rd (CH1) DRT | |
0.12 miles | 1450 E Devon Ave (CH3) DRT | |
0.20 miles | 2299 Busse (CH2) Digital Realty |
|
0.28 miles | Cyxtera Elk Grove CH3 |
Cyxtera's CH3 Elk Grove site is across the street from the Digital Realty Chicago campus (former Dupont Fabros) and close to Equinix CH3.
|
0.39 miles | Stream Chicago II | |
0.60 miles | Equinix Chicago CH3 |
|
0.65 miles | Skybox Chicago I | |
0.69 miles | EdgeConneX CHI02 | |
0.73 miles | EdgeConneX CHI01 | |
0.74 miles | Edgeconnex Chicago Campus |
The first Chicago site was leaked to the press in Oct 2016. Microsoft is expected to be the anchor tenant with the site supporting up to 25-30 MWs.
|
0.78 miles | CoreWeave: US Central ORD1 | |
0.78 miles | Stream Chicago I |
|
0.86 miles | STACK Chicago CHI01 |
|
0.90 miles | STACK CHI01B |
STACK INFRASTRUCTURE CHI01B Chicago Data Center is located at 1441 Touhy Avenue, Elk Grove Village, IL, which currently offers 24 MW of critical power and 221,000 square feet of space.
|
1.30 miles | Element Critical CH1 |
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
|
1.48 miles | Element Critical CH2 |
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
|
1.98 miles | Prime Elk Grove | |
2.11 miles | T5 Chicago II | |
2.19 miles | NTT: 1250 N Arlington Heights (Planned) |
In November 2023, NTT Global Data Centers in November paid $27.5 million for the building
|
2.19 miles | NTT: 1200 N Arlington Heights (Planned) |
Expansion site acquired in November 2023.
|
2.55 miles | NTT Chicago CH1 |
RagingWire’s Chicago CH1 Data Center is under construction and in the pre-leasing stage. It will be a 654,000 square foot, 52 megawatt facility on a 19-acre fenced campus near Chicago.
|
2.58 miles | CenturyLink: Arlington Heights | |
2.70 miles | CloudHQ Mount Prospect ORD3 |
|
2.94 miles | Aligned: ORD-03 |
Aligned is about to build a datacenter campus after acquiring an assemblage of beleaguered office properties near O’Hare International. The company’s plan for the 36-acre site calls for a pair of two-story, 520,000-square-foot data centers.
|
4.30 miles | Iron Mountain Chicago |
First announced in 2018, the former Hart Schaffner Marx suit factory started construction in 2024.
|
4.80 miles | T5 Northlake IL | |
5.51 miles | Microsoft Chicago Northlake |
|
5.79 miles | 505 N Railroad Ave - Digital Realty |
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
|
6.05 miles | Aligned Chicago ORD-01 |
Aligned's ORD-01 data center is a state-of-the-art facility located in Northlake, IL, just outside of downtown Chicago. At full build, Aligned’s Chicago campus covers 520,000 sq. ft. and offers ~72 MW of critical load.
|
6.05 miles | DataBank ORD3 Mount Prospect |
|
6.05 miles | Colocation America CH3 | |
6.08 miles | Aligned ORD-02 |
Aligned's ORD-02 is a data center located in Northlake, IL near downtown Chicago. Part of Aligned's 18.5-acre hyperscale campus, ORD-02 offers exceptional connectivity at the convergence of over 12 metro/long-haul networks. At full build, ORD-02 building will provide 36MW of critical load capacity expandable to ~52 MW.
|
6.96 miles | Complete Source Schaumburg | |
6.98 miles | Digital Chicago Franklin Park Campus on Grand Ave - Digital Realty |
Digital Chicago is a master-planned 40-acre campus in the Village of Franklin Park. The campus has 3 existing buildings, totaling 574,994 sqft
|
6.99 miles | 9377 Grand Ave | |
7.01 miles | 9355 Grand Ave | |
7.06 miles | 9333 Grand Ave (DRT) | |
7.06 miles | SingleHop Chicago | |
7.09 miles | Tierpoint Chicago West | |
9.94 miles | LexusNexis Oak Brook | |
9.94 miles | DataBank (ORD4) Oak Brook |
|
9.94 miles | XO (Swift Dr) |
|
10.30 miles | Server Farm Oak Brook |
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
|
10.30 miles | US Signal Oakbrook |
800a 480V 3 phase
450kW diesel generator with 24 hour run time at full load
500kVa UPS capacity with battery backup
|
10.30 miles | XO: (Oak Brook) | |
10.36 miles | Digital Fortress: Chicago Lombard | |
10.36 miles | 360TCS-Lombard | |
10.37 miles | NYI Chicago (Oak Brook) | |
10.50 miles | Microsoft Hoffman Estates 2 | |
10.57 miles | Microsoft Hoffman Estates 1 | |
10.61 miles | CyrusOne Chicago Lombard |
9 MW of critical capacity
Both a 1.5MW and a 2MW transformer
|
11.04 miles | Lumen Broadview | |
12.57 miles | Equinix Chicago CH7 |
|
12.58 miles | Verizon Chicago (Downers Grove) |
|
14.49 miles | Compass Hoffman Estates | |
14.91 miles | Evoque Lisle CH1 |
|
16.17 miles | Cogent Naperville | |
16.86 miles | New Continuum: 603 Discovery | |
17.28 miles | Metro Edge: Illinois Medical District (IMD) | |
17.44 miles | NetSource Chicago | |
17.60 miles | Lumen Chicago 2 | |
17.71 miles | Lumen Chicago 4 | |
18.27 miles | GTT - 111 North Canal | |
18.27 miles | Lumen Chicago 1 |
|
18.41 miles | Lumen Chicago 6 |
|
18.44 miles | QTS Chicago |
The campus was a former Sun Times Press Facility and was acquired in 2014
|
18.46 miles | TierPoint Chicago Polk |
|
18.48 miles | First Communications Chicago | |
18.49 miles | Lumen Chicago 3 |
|
18.63 miles | DataBank (ORD2) 840 S Canal |
|
18.63 miles | Server Farm Realty 840 South Canal |
4 MW Critical Load on Each Floor (Floors 1-5)
130-160 Watts per Raised Floor SF
|
18.66 miles | Cogent: 216 W Jackson | |
18.84 miles | XO: 140 S Dearborn | |
18.86 miles | CoreSite Chicago CH2 |
In February 2018, CoreSite acquired a two-acre land parcel in downtown Chicago, Illinois, on which CoreSite built CH2, a greenfield development of a 175,000-square-foot, turn-key, four-story data center supporting 18 critical megawatts of power capacity. The building was completed in June 2020.
|
18.86 miles | QuadraNet Chicago | |
18.87 miles | CoreSite Chicago CH1 |
Once owned by the Western Union company, the building was formerly known as "The Telegraph Building."
|
18.87 miles | Cogent: 427 S LaSalle | |
18.87 miles | 365 Chicago |
The site is a former Switch and Data site (also owned by Equinix for a short period.)
|
18.87 miles | InfoRelay Chicago | |
18.88 miles | Netrality Chicago: 717 S Wells |
The 10 story building was constructed in 1923 and eventually was converted into a data center.
|
18.88 miles | GTT - 717 South Wells | |
18.89 miles | Atlantic Metro ORD3 | |
18.89 miles | Colo@ Chicago |
|
18.89 miles | Steadfast Chicago 725 Wells |
|
18.89 miles | Crown Castle 725 S Wells |
|
18.89 miles | 725 S Wells - 1547 Critical Systems |
1547 Acquired the site in December of 2018.
|
18.99 miles | Colocation America CH2 | |
18.99 miles | Lumen Chicago 5 | |
18.99 miles | Cogent: 600 S Federal | |
18.99 miles | 600 S Federal - Digital Realty | |
19.88 miles | CyrusOne Chicago Aurora CME |
In 2016, CyrusOne acquired the CME data center for $130 million. CME hosts its electronic trading platform CME Globex on site. Globex will continue to be hosted on site as part of the 15-year lease agreement between CyrusOne and CME.
|
ColoCrossing is owned by Velocity Servers Network Exchange (VSNX)
Founded in 2003 and headquartered in Buffalo, New York, VSNX provides colocation, dedicated servers, disaster recovery, application hosting and Voice over IP software.
Name | Date Added | Description |
---|---|---|
colocrossing_chi1_specifications | May 2017 |
Colocrossing Chicago Data Sheet (PDF) |