Distance | Site | About |
---|---|---|
0.00 miles | Lumen Chicago 5 | |
0.00 miles | Cogent: 600 S Federal | |
0.01 miles | 600 S Federal - Digital Realty | |
0.14 miles | CoreSite Chicago CH1 |
Once owned by the Western Union company, the building was formerly known as "The Telegraph Building."
|
0.14 miles | Cogent: 427 S LaSalle | |
0.14 miles | 365 Chicago |
The site is a former Switch and Data site (also owned by Equinix for a short period.)
|
0.14 miles | InfoRelay Chicago | |
0.15 miles | QuadraNet Chicago | |
0.19 miles | GTT - 717 South Wells | |
0.19 miles | Netrality Chicago: 717 S Wells |
The 10 story building was constructed in 1923 and eventually was converted into a data center.
|
0.20 miles | Atlantic Metro ORD3 | |
0.20 miles | Steadfast Chicago 725 Wells |
|
0.20 miles | Crown Castle 725 S Wells |
|
0.20 miles | Colo@ Chicago |
|
0.20 miles | 725 S Wells - 1547 Critical Systems |
1547 Acquired the site in December of 2018.
|
0.36 miles | Cogent: 216 W Jackson | |
0.38 miles | XO: 140 S Dearborn | |
0.57 miles | Server Farm Realty 840 South Canal |
4 MW Critical Load on Each Floor (Floors 1-5)
130-160 Watts per Raised Floor SF
|
0.57 miles | DataBank (ORD2) 840 S Canal |
|
0.68 miles | First Communications Chicago | |
0.69 miles | TierPoint Chicago Polk |
|
0.73 miles | Lumen Chicago 6 |
|
0.82 miles | GTT - 111 North Canal | |
0.82 miles | Lumen Chicago 1 |
|
0.83 miles | Lumen Chicago 3 |
|
0.98 miles | CoreSite Chicago CH2 |
In February 2018, CoreSite acquired a two-acre land parcel in downtown Chicago, Illinois, on which CoreSite built CH2, a greenfield development of a 175,000-square-foot, turn-key, four-story data center supporting 18 critical megawatts of power capacity. The building was completed in June 2020.
|
1.53 miles | 350 E Cermak - Digital Realty |
|
1.53 miles | Cyxtera Chicago CH4 |
Digital Realty Trust owns the building at 350 Cermak and is CTL's Landlord.
|
1.53 miles | Atlantic Metro ORD0 |
|
1.53 miles | Steadfast Chicago 350 E Cermak |
|
1.53 miles | Cyxtera Chicago CH2 |
Within DRT's Cermak carrier hotel
|
1.53 miles | Equinix Chicago CH1, CH2, & CH4 |
Equinix distinctly separates CH1, CH2, and CH4 into separate data centers, but in reality, the sites are in the same building.
|
1.53 miles | Colocation America CH1 |
|
1.54 miles | ServerCentral Chicago DRT-CH1 | |
1.72 miles | Lumen Chicago 4 | |
1.86 miles | Lumen Chicago 2 | |
2.50 miles | Metro Edge: Illinois Medical District (IMD) | |
2.97 miles | QTS Chicago |
The campus was a former Sun Times Press Facility and was acquired in 2014
|
5.49 miles | 1547 Chicago Midway Technology Centre |
|
11.83 miles | Lumen Broadview | |
12.28 miles | Tierpoint Chicago West | |
12.33 miles | 9333 Grand Ave (DRT) | |
12.33 miles | SingleHop Chicago | |
12.34 miles | Digital Chicago Franklin Park Campus on Grand Ave - Digital Realty |
Digital Chicago is a master-planned 40-acre campus in the Village of Franklin Park. The campus has 3 existing buildings, totaling 574,994 sqft
|
12.35 miles | 9377 Grand Ave | |
12.36 miles | 9355 Grand Ave | |
12.82 miles | Digital Crossroad (Indiana NAP) |
|
12.98 miles | Digital Crossroad: Hammond, IN (Phase 2) |
Digital Crossroad is planning to expand its campus in Hammond, Indiana. The company plans to add another 180,000 sq ft (16,720 sqm) building and 20MW in the second phase.
|
13.98 miles | T5 Northlake IL | |
14.84 miles | 505 N Railroad Ave - Digital Realty |
The Digital Chicago Campus covers 21 acres of land with access to major fiber networks and can support up to 8 MW of IT load at N+1 redundancies.
|
15.01 miles | Aligned ORD-02 |
|
15.02 miles | Aligned Chicago ORD-01 | |
15.04 miles | DataBank (ORD4) Oak Brook |
|
15.04 miles | XO (Swift Dr) |
|
15.04 miles | LexusNexis Oak Brook | |
15.23 miles | Microsoft Chicago Northlake |
|
15.97 miles | Iron Mountain Chicago |
Iron Mountain is planning a (but not yet constructed facility in Chicago.)
|
16.05 miles | Server Farm Oak Brook |
The campus was originally built as the corporate headquarters of the Chicago Bridge & Iron Company (CB&I).
|
16.05 miles | XO: (Oak Brook) | |
16.05 miles | US Signal Oakbrook |
800a 480V 3 phase
450kW diesel generator with 24 hour run time at full load
500kVa UPS capacity with battery backup
|
16.18 miles | NYI Chicago (Oak Brook) | |
18.15 miles | Equinix Chicago CH7 |
|
18.16 miles | Verizon Chicago (Downers Grove) |
|
18.58 miles | Element Critical CH1 |
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (711).
|
18.60 miles | Element Critical CH2 |
Element Critical acquired the site in January 2019 from Sungard. The facility was previously known as SunGard Wood Dale (341).
|
18.66 miles | EdgeConneX CHI01 | |
18.66 miles | Edgeconnex Chicago Campus |
The first Chicago site was leaked to the press in Oct 2016. Microsoft is expected to be the anchor tenant with the site supporting up to 25-30 MWs.
|
18.71 miles | Cyxtera Elk Grove CH3 |
Cyxtera's CH3 Elk Grove site is across the street from the Digital Realty Chicago campus (former Dupont Fabros) and close to Equinix CH3.
|
18.76 miles | Stream Chicago I |
|
18.76 miles | EdgeConneX CHI02 | |
18.80 miles | 2299 Busse (CH2) Digital Realty |
|
18.86 miles | Equinix Chicago CH3 |
|
18.95 miles | Stream Chicago II | |
18.97 miles | 2200 Busse Rd (CH1) DRT | |
18.97 miles | Rackspace Elk Grove ORD1 | |
18.99 miles | Digital Elk Grove Village Campus |
Digital Realty Trust's Chicago campus is massive and is split among 3 buildings. The campus was acquired from Dupont Fabros in September 2017.
|
18.99 miles | ServerCentral CH1 |
|
18.99 miles | ColoCrossing CH1 |
|
19.09 miles | 1450 E Devon Ave (CH3) DRT | |
19.47 miles | STACK Chicago CHI01 |
|
19.52 miles | 360TCS-Lombard | |
19.52 miles | Digital Fortress: Chicago Lombard | |
19.54 miles | Skybox Chicago I | |
19.57 miles | STACK CHI01B |
STACK INFRASTRUCTURE CHI01B Chicago Data Center is located at 1441 Touhy Avenue, Elk Grove Village, IL, which currently offers 24 MW of critical power and 221,000 square feet of space.
|
19.65 miles | CoreWeave: US Central ORD1 | |
19.85 miles | CenturyLink: Arlington Heights | |
19.86 miles | CloudHQ Mount Prospect ORD3 |
|
19.92 miles | Prime Elk Grove |
Established in 2000, Colocation America has grown to become one of the most reliable colocation hosting providers nationwide. With their main data centers in Los Angeles, CA, Colocation America was built from the ground up by professional engineers with a vision of delivering a fully integrated, trusted colocation hosting service.