This stacking plan shows the layout of CH1, CH2, and CH4 in the building. The Telx (now Digital Realty) Meet-Me-Room on the 2nd floor. Financial Exchanges such as BATS, CME, and ICE are also noted.
Space inside Netrality interconnected colocation facility at 717 South Wells Chicago
The buildings and next to each other
The data center was acquired in April 2016
Phase 1 has 6 MW of power and 48,000 square feet of raised floor space
Centrally located, well connected, and completely designed as a data center. This facility offers 20MW of data center critical load with a total electrical service to the building of 40 MW and auto...
Cooling Towers
Posted in Microsoft Chicago Northlake Source: MH Architects
Gens stacked up
Posted in Microsoft Chicago Northlake Source: MH Architects
Northlake substation on campus
Posted in Microsoft Chicago Northlake
Container Canyon" area
Posted in Microsoft Chicago Northlake
Rooftop view at 350 E Cermak
Posted in Equinix Chicago CH1, CH2, & CH4
This stacking plan shows the layout of CH1, CH2, and CH4 in the building. The Telx (now Digital Realty) Meet-Me-Room on the 2nd floor. Financial Exchanges such as BATS, CME, and ICE are also noted.
Stack Plan for Equinix Facilities in 350 E Cermak
Posted in Equinix Chicago CH1, CH2, & CH4

This stacking plan shows the layout of CH1, CH2, and CH4 in the building. The Telx (now Digital Realty) Meet-Me-Room on the 2nd floor. Financial Exchanges such as BATS, CME, and ICE are also noted.

Source: Equinix
Lobby of CH3
Posted in Equinix Chicago CH3 Source: Equinix
Exterior of CH3
Posted in Equinix Chicago CH3 Source: Equinix
Rendering of the STACK expansion facility in Elk Grove
Posted in STACK Chicago Source: STACK
CHI01 Site Layout
Posted in STACK Chicago Source: STACK
Outside of 350 E Cermak
Posted in 350 E Cermak - Digital Realty
Rendering of DRT's planned 12-story Data Center at 330 East Cermak
Posted in 350 E Cermak - Digital Realty Source: Digital Realty Trust
Lincoln Rackhouse Aurora Facility
Posted in 4267 Meridian Pkwy: Lincoln Rackhouse
6th Floor Meet Me Room
Posted in Netrality Chicago: 717 S Wells Source: Netrality
Exterior from the Street
Posted in Netrality Chicago: 717 S Wells
Row of Cabinets on Slab
Posted in Netrality Chicago: 717 S Wells Source: Netrality
Empty Colo Cages Ready to be Filled
Posted in Netrality Chicago: 717 S Wells Source: Netrality
717 MMR Racks
Posted in Netrality Chicago: 717 S Wells Source: Netrality
Space inside Netrality interconnected colocation facility at 717 South Wells Chicago
Floor Ready for Data Center Rentovation
Posted in Netrality Chicago: 717 S Wells

Space inside Netrality interconnected colocation facility at 717 South Wells Chicago

Source: Netrality
High Density Room inside New Continuum Site
Posted in New Continuum: 603 Discovery Source: New Continuum
Crypto Miner Deployment inside of 603 Discovery Data Center
Posted in New Continuum: 603 Discovery Source: New Continuum
Drone Shot of New Continuum Chicago Facility
Posted in New Continuum: 603 Discovery
The buildings and next to each other
CME Campus Layout
Posted in CyrusOne Chicago Aurora CME

The buildings and next to each other

Source: CyrusOne
Rendering of Aurora II
Posted in CyrusOne Chicago Aurora CME Source: CyrusOne
The data center was acquired in April 2016
Aurora I Facility
Posted in CyrusOne Chicago Aurora CME

The data center was acquired in April 2016

Source: CyrusOne
Equinix's Westmont Site (CH7)
Posted in Equinix Chicago CH7
Rendering of CHI-1
Posted in Iron Mountain Chicago Source: Iron Mountain
Front Gate
Posted in 505 N Railroad Ave - Digital Realty Source: Digital Realty Trust
Overhead at Twilight
Posted in 505 N Railroad Ave - Digital Realty Source: CBRE
Equipment Yard
Posted in 505 N Railroad Ave - Digital Realty Source: CBRE
Diagram of QTS's Site in Chicago
Posted in QTS Chicago Source: QTS
Exterior View of QTS's Chicago Building
Posted in QTS Chicago Source: QTS
Raw Space Ready for Build-out
Posted in QTS Chicago Source: Bisnow/Dees Stribling
Lobby Entrance
Posted in QTS Chicago
Phase 1 has 6 MW of power and 48,000 square feet of raised floor space
QTS Chicago Site Layout
Posted in QTS Chicago

Phase 1 has 6 MW of power and 48,000 square feet of raised floor space

Source: QTS
KyotoCooling System
Posted in QTS Chicago
Chicago SunTimes Building Before QTS's Acquisition
Posted in QTS Chicago
Kyoto Units Installed on the Roof
Posted in QTS Chicago Source: Mission Critical Magazine
Front of the Facility
Posted in CyrusOne Chicago Lombard Source: CONE
Lombard Site Floor Plan
Posted in CyrusOne Chicago Lombard Source: CyrusOne
427 S LaSalle: 1st Floor Layout
Posted in CoreSite Chicago CH1
427 S LaSalle: 5th Floor Layout
Posted in CoreSite Chicago CH1 Source: CoreSite
427 S LaSalle: 6th Floor Layout
Posted in CoreSite Chicago CH1 Source: CoreSite
Western Union Building with Chicago Board of Trade in the Background
Posted in CoreSite Chicago CH1
CH1 Entrance to "The Telegraph Building"
Posted in CoreSite Chicago CH1 Source: CoreSite
Centrally located, well connected, and completely designed as a data center. This facility offers 20MW of data center critical load with a total electrical service to the building of 40 MW and auto...
Rendering of SFR's Downtown Chicago Facility
Posted in Server Farm Realty 840 South Canal

Centrally located, well connected, and completely designed as a data center. This facility offers 20MW of data center critical load with a total electrical service to the building of 40 MW and autonomous back-up power for 24-hours.

Source: SFR