CentriLogic Mississauga (South)

2 Robert Speck Pkwy

░░░░░░ Login to view SqFt Gross Colocation Size

Show SqM

Operated by:

Map and Nearby Locations:

2 Robert Speck Pkwy
Click Map to begin Search

Sites within 15 miles of CentriLogic Mississauga (South)

Show SqM
Distance Site About
2.75 miles CentriLogic Mississauga (North)
18″ raised floor with hot/cold aisle configuration 24/7/365 Security & Multi-level Biometric Access Control
3.25 miles TeraGo Mississauga
4.07 miles Excell IT
5.02 miles eStruxture TOR-3 (Etobicoke)
5.34 miles Cogent Mississauga
5.42 miles Compass Toronto Etobicoke
5.86 miles Cyxtera Mississauga TR1
One story building Raised floor (inches) = 24 and 30
6.19 miles Canada15Edge Toronto West
10.71 miles ServerFarm Toronto TOR1
Site is approximately 7.14 acres Three 10,000 SF data halls with ample office and conference space
10.94 miles Equinix Brampton TR6
11.03 miles Equinix Brampton TR7
The site was formerly known as "Q9 Toronto Two" which was acquired by Equinix in 2020 from Bell Canada.
11.04 miles Beanfield 23 Fraser
11.67 miles Cologix Toronto TOR2
Cologix’s second Toronto data centre site at 905 King Street (TOR 2) was built using standards for concurrent maintainability for space, power, mechanical systems and security. The TOR 2 data centre can be utilized as a stand-alone, diverse bypass facility to Cologix's TOR 1 data centre at 151 Front Street.
11.67 miles 905 King Street W
11.67 miles Contegix Toronto
11.67 miles Beanfield 905 King St
12.36 miles Compass: North York
12.89 miles 250 Front Street - Allied
Also known as the Canadian Broadcasting Centre, the building is a block away from Allied's carrier hotel, 151 Front Street.
13.08 miles Cologix Toronto TOR1
Cologix operates seven discrete Toronto data centres at 151 Front Street West (TOR 1), Canada’s largest and most important carrier hotel.
13.08 miles Equinix Toronto TR1
Equinix's facilities in Toronto has a long history that includes several acquisitions. The original suites now operated by Equinix at 151 Front Street began with RACO, a Canadian company that Switch and Data acquired in 2004.
13.08 miles Neutral Data Toronto
13.09 miles eStruxture TOR-1
13.09 miles 151 Front Street
151 Front Street is Canada's largest carrier hotel, where the telecom, Internet service providers, and content companies colocate to exchange traffic (peer) between their respective networks.
13.09 miles Digital Realty 151 Front
13.09 miles Priority Colo TOR1
13.13 miles eStruxture TOR-2
13.19 miles CenriLogic Toronto
13.20 miles Equinix Toronto TR4
The site was formerly known as "Q9 Toronto 2, 3, and 4" which were acquired by Equinix from Bell Canada in 2020.
13.32 miles TNW Toronto
13.34 miles 1 Century Place (TOR1) Digital Realty
This site was originally operated by Dupont Fabros as TOR1 before being acquired in Sept 2017 by Digital Realty Trust in a $7.6 Billion 12 datacenter deal. Located just outside the city of Toronto in nearby Vaughan, this Canadian wholesale data centre spans over 66,000 square metres (711,000 square feet) with a critical power capacity of up to 46 megawatts. The site was the former Toronto Star Printing plant.
14.26 miles Urbacon Toronto - 281 Front Street
At the intersection of Front Street East and Parliament Street, 281 Front is less than one and a half kilometres from Canada’s financial heart, and directly abutting 151 Front Street, which is Toronto's carrier hotel.
14.28 miles Equinix Toronto TR2
TR2 is also known as Parliament Street Data Centre TR2 has metro connections to TR1, which is home to one of Canada's largest financial trading ecosystems. TR2 hosts Internet Exchange, Ethernet Exchange and Equinix Cloud Exchange™ connectivity to TR1.
14.57 miles Canada Cloud Data Centre
16.52 miles ILAP 210 Sheppard
16.89 miles TeraGo Vaughn
17.62 miles Lumen Toronto 1
19.73 miles Stack: TOR01C
Stack Infrastructure's TOR01C facility is just seven miles away from 151 Front Street. The third phase will offer 24MW to support client growth on a campus tailored as a purpose-built solution for scalability.
19.80 miles STACK Toronto TOR01
Stack Infrastructure's TOR01 Campus is just seven miles away from 151 Front Street, Toronto's largest carrier hotel and primary internet exchange point. Toronto-based developer First Gulf partnered with STACK to deliver the initial 8MW data center by renovating an existing building TOR01A.
19.81 miles Stack: TOR01B
Stack Infrastructure's TOR01B facility is just seven miles away from 151 Front Street. The 24MW phase of development features committed power from Toronto Hydro from three diverse substations using 100% renewable energy sources.

CentriLogic Mississauga (South) Data Center Photos

Operating Company

CentriLogic is a provider of data center, managed hosting, cloud computing, and advanced IT outsourcing solutions.

7 Facilities Owned
10 Markets Served
4.0 Megawatts
View Company

News

Read More News