CentriLogic Berkshire

No. 5 Arlington Square Bracknell

░░░░░ Login to view SqFt Gross Colocation Size

Show SqM

Operated by:

CentriLogic operates a the data center in the heart of the Thames Valley. From this facility, CentriLogic delivers customers its comprehensive suite of hybrid hosting, cloud computing, co-location, and managed services.

Facility:

  • Tier III - Concurrently Maintainable
  • 5,500 Square Feet With Expansion Capabilities
  • Dedicated Customer Meeting Rooms & Break-Out Areas
  • Dedicated Build / Staging Room & Customer Bonded Storage Areas
  • On-Site Parking
  • SSAE 16 SOC 2 Type 2 Certified
  • PCI DSS Compliance

Redundant Power:

  • Diverse Dedicated 3.0MVA Incoming Power Supplies From Separate Grid Substations
  • A+B Power Distribution
  • Multiple UPS Modules With N+1 Resilience
  • Dual 2MVA Backup Diesel Generators With 96 Hours of Standby Fuel
  • Emergency Fuel Supply Contracts With Multiple Providers

Network & Connectivity:

  • Multiple Backbone Providers With Diversely Routed Entry Points
  • Multi-Homed Resilient Bandwidth
  • Inter-Facility Connectivity

Environmental:

  • N+1 Redundant & Independent Cooling Units
  • Strict Temperature & Humidity Control
  • Leak Detection & Environmental Monitoring

Advanced Security:

  • 24/7/365 Manned Security & Multi-Level Access Control
  • Physical Security With Access Alarm System
  • Two Factor Authentication
  • 24/7/365 Internal / External CCTV Monitoring & Motion Recording

Fire Detection & Suppression:

  • Very Early Smoke Detection Apparatus (VESDA)
  • Inert Gas (IG55) Fire Suppression

Map and Nearby Locations:

No. 5 Arlington Square Bracknell
Click Map to begin Search

Sites within 15 miles of CentriLogic Berkshire

Show SqM
Distance Site About
0.22 miles Level3 Bracknell
5.60 miles Cyxtera Reading LHR3
Southern Electric provides power feeds Power density minimum(W/sf) = 150
6.22 miles Pulsant Maidenhead P1
7.47 miles Ark: Longcross
7.80 miles Zayo Egham
7.92 miles iomart DC5 Maidenhead
8.36 miles Pulsant Reading East 2
9.06 miles Equinix LD11x
9.11 miles China Mobile Slough
9.11 miles Equinix LD4
Equinix's LD4 datacenter is part of Equinx's Slough Campus, an important Financial trading hub.
9.15 miles VIRTUS London 11
9.17 miles Cyxtera Slough LO5
Cyxtera's LO5 site in Slough West of London was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink. The transaction which closed in May 2017 created Cyxtera Technologies.
9.20 miles Equinix LD6
9.22 miles Kao Data Slough
9.23 miles QTS London
9.23 miles Equinix LD5
Equinix's LD5 datacenter is part of Equinx's Slough Campus, an important Financial trading hub. More details can be found on the Slough Campus page.
9.25 miles GTR Slough
The campus will comprise of three independent data centres capable of operating individually, or as one interlinked campus,
9.27 miles NTT Slough 2
9.29 miles Equinix LD7
9.30 miles NTT Slough 3
The site was previously known as "Gyron Ajax 2 - Slough" before being acquired by NTT.
9.31 miles Equinix LD14
9.31 miles Equinix LD12
9.32 miles VIRTUS LONDON9
9.33 miles Equinix Slough Campus LD4, LD5, LD6, LD10
Critical to London’s Financial industry, Equinix’s collection of non-contigous data cetners in Slough function as a virtual campus via innerduct paths that connect them. The campus is one of the largest data centres in London.
9.33 miles VIRTUS LONDON10
9.35 miles Logicalis Slough
9.35 miles Redcentric Reading
9.36 miles Equinix LD13x
9.36 miles Iron Mountain London LON-1
Strategically located in the Slough Trading Estate, LON-1 is a 183,000 SF colocation facility on Iron Mountain's 5.5-acre London data center campus. Enjoy close proximity to one of Europe's largest network ecosystems. The site was acquired in a sale-leaseback transaction with Credit Suisse
9.37 miles GoDaddy Slough (HEG)
9.40 miles Rackspace London Slough (LON3)
Raised Flooring: 5,000 sq m 15 MVA Total Utility Power Manned 24x7x365
9.45 miles VIRTUS Slough London 3 and 4
The datacenter first opened in 2014 by Infinity SDC, but in 2015 VIRTUS acquired the site which is now called London 3. London3 is the closest (non-Equinix) facilities to Equinix's LD4 making it an option to be part of the financial trading ecosystem, but colocated outside of Equinix.
9.45 miles Equinix LD10
9.47 miles Iron Mountain London LON-2
9.47 miles CyrusOne London I
Located in Slough, one of the UK’s premier data center locations, CyrusOne London I delivers 9MW of IT power to 4,300 sq m of technical space.
9.48 miles CyrusOne London III
Built-in 2021, CyrusOne London III is a purpose-built data center offering over 39,000 sqft of technical space.
9.49 miles Ark Cody Park
9.52 miles Datum FRN1
9.54 miles Amito Reading
9.56 miles Level3 Slough
9.77 miles Digital Realty Woking
9.77 miles CyrusOne London Woking
9.82 miles NaviSite Woking
9.82 miles Redcentric Woking TC3
10.30 miles Yondr Slough
The 1st phase was completed in 2024. The 2nd phase will be completed in late 2025.
12.91 miles 4D Surrey
Based in Byfleet, 4D's Tier-3 Surrey data centre is close to M25 and about 30 minutes to London Waterloo. It's carrier neutral and offers u-space, quarter, half and full racks with options for data halls and suites.
13.28 miles ServerFarm London
3,000 m² of data hall expansion space available within 6 – 9 months Concurrently maintainable standards
13.63 miles DRT London (West Drayton)
13.67 miles Redcentric Theale
14.12 miles DRT London (Cresses Business Park)
14.60 miles VIRTUS Stockley Park Campus
LONDON6 was opened
14.60 miles CyrusOne: London II
14.71 miles CyrusOne London II (Stockley Park)
The London II datacenter was originally built by Infinity SDC.
15.40 miles Verizon London UK4
15.96 miles Redcentric Hounslow
16.15 miles Ark: Union Park
16.22 miles VIRTUS Hayes London2
19.20 miles Barclays Data Centre

CentriLogic Berkshire Data Center Photos

Operating Company

CentriLogic is a provider of data center, managed hosting, cloud computing, and advanced IT outsourcing solutions.

7 Facilities Owned
10 Markets Served
4.0 Megawatts
View Company

News

Read More News