0.10 miles
|
45900 Pathfinder Plz
|
|
0.17 miles
|
AWS: 45950 Pathfinder Plz
|
|
0.60 miles
|
AWS: 22900 Platform Plz
|
|
0.79 miles
|
Cyxtera IAD2-A
|
Cyxtera's DC5 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink.
|
0.84 miles
|
Cyxtera IAD2-B
|
|
0.87 miles
|
CyrusOne Northern Virginia Sterling IV
|
|
0.88 miles
|
AWS: 22868 International Dr
|
|
1.02 miles
|
AWS: 22945 International Dr
|
|
1.26 miles
|
Vantage VA2 Campus
|
|
1.42 miles
|
Amazon IAD-51
|
|
1.43 miles
|
Amazon 22420 Kipper
|
|
1.47 miles
|
Amazon IAD-56
|
|
1.50 miles
|
Amazon 22370 Kipper
|
|
1.63 miles
|
Aligned IAD03
|
Phase one delivery of the campus’ first facility, IAD-03, is targeted for Fall 2023. Once complete, the Build-to-Scale deployment is planned to culminate in a four-story, 72 MW, 430,000 sq. ft. hyperscale data center.
|
1.68 miles
|
Amazon 45111 Loudoun Downs
|
|
1.71 miles
|
Amazon IAD-58
|
|
1.72 miles
|
Amazon IAD-57
|
|
1.72 miles
|
Amazon IAD-88
|
|
1.74 miles
|
Vantage Ashburn Campus
|
The first phase of the campus was completed in Q1 of 2019. The phase will consist of a 24MW capacity building, with 6MW of critical IT load fully operational on day one.
|
1.77 miles
|
Vantage VA11
|
|
1.80 miles
|
Sentinel Ashburn
|
|
1.81 miles
|
Vantage VA12
|
|
1.86 miles
|
Vantage VA13
|
|
1.89 miles
|
EdgeCore: Sterling, NV
|
EdgeCore plans a new 285,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Va. The three-story site will support 36 megawatts.
|
1.90 miles
|
Cyxtera Sterling DC7
|
Cyxtera's DC7 site in Sterling Virginia was acquired via a $2.8 billion transaction to acquire 57 datacenters from CenturyLink
|
1.99 miles
|
EdgeCore: Ashburn, AS02
|
EdgeCore Digital Infrastructure will team up with Washington, D.C.-based developer Penzance on a new 285,000-square-foot data center on 7.6 acres at 1501 Moran Road in Sterling, Va. The three-story site will support 36 megawatts.
|
2.01 miles
|
Amazon IAD12
|
|
2.05 miles
|
STACK Northern Virginia
|
The Infomart Ashburn site contains up to 6 data halls. Each data hall is 10,000sqft and can handle between 2 and 3 MW each. There is also 10,000 sqft of office space.
|
2.06 miles
|
QTS Ashburn-Moran
|
QTS acquired this site via the Carpathia acquisition in 2015 and was previously known as "QTS Dulles (The Vault)"
|
2.06 miles
|
Amazon IAD16
|
|
2.07 miles
|
Amazon IAD15
|
|
2.08 miles
|
Skybox Northern Virginia
|
Skybox NOVA is a ten-acre private campus with flexible configurations with 30 MW of power and 210,500 SF from 120-600 watts per square foot.
|
2.17 miles
|
Lumen Herndon 1
|
|
2.19 miles
|
Amazon IAD76
|
|
2.19 miles
|
Lumen Herndon 3
|
|
2.24 miles
|
QTS Ashburn 1
|
There is 2.66 MW of Critical Power per Data Hall
|
2.27 miles
|
CyrusOne Sterling VIII
|
|
2.29 miles
|
PowerHouse Pacific
|
|
2.32 miles
|
EdgeCore: Ashburn, AS01
|
EdgeCore is aiming to build a data center at 45865 Maries Road, Sterling, VA. The Maries Road location will offer 348,000 sq ft and 54MW.
|
2.39 miles
|
Cogent: 510 Huntmar
|
|
2.42 miles
|
Cyxtera Sterling DC2
|
|
2.44 miles
|
Digital Realty: Broderick Drive
|
|
2.47 miles
|
Digital Realty: IAD43
|
|
2.47 miles
|
Cyxtera Sterling DC3
|
|
2.48 miles
|
Amazon 45305 Severn
|
|
2.48 miles
|
COPT: 45761 Maries Rd
|
|
2.49 miles
|
21710 Charles View
|
|
2.50 miles
|
Cyxtera Sterling DC4
|
|
2.52 miles
|
QTS Ashburn Lockridge
|
|
2.53 miles
|
21110 Ridgetop - Digital Realty
|
The site is fully leased to triple net tenants.
|
2.55 miles
|
Equinix DC97
|
|
2.57 miles
|
Amazon 45259 Severn
|
|
2.59 miles
|
COPT: 45751 Maries Rd
|
|
2.61 miles
|
CyrusOne Northern Virginia Sterling I, II, III
|
|
2.62 miles
|
Sentinel Washington Dulles Gateway
|
Sentinel Data Centers acquired the 280-acre plot in Sterling Virginia for $82.5 million. As of July 2018 the land is undeveloped and Sentinel has not announced plans for the site.
|
2.62 miles
|
Amazon IAD-69
|
|
2.62 miles
|
21641 Charles View
|
|
2.63 miles
|
Amazon IAD10
|
|
2.65 miles
|
Amazon IAD32
|
|
2.66 miles
|
Lincoln Rackhouse 251 Exchange
|
The site also houses a Verizon CO and was formerly Level3 site known as Herndon 2, but Level3 has since moved out.
|
2.69 miles
|
Aptum Herndon
|
The site was originally a Peer 1 site before the Cogeco acquisition.
|
2.81 miles
|
CyrusOne Northern Virginia Sterling V
|
|
2.84 miles
|
H5 Ashburn
|
The data center located on Beaumeade Circle will qualify for Virginia data center sales and use tax exemption.
|
2.87 miles
|
Equinix DC21
|
|
2.95 miles
|
Stack: Northern Virginia NVA04
|
Stack Infrastructure's 80-acre NVA04 campus offers plans for three buildings totaling nearly 1 million sq. ft.
|
2.97 miles
|
44751 Round Table (Bldg P)
|
|
3.05 miles
|
PowerHouse ABX1
|
|
3.05 miles
|
EdgeCore Ashburn
|
|
3.06 miles
|
21780 Filigree: Digital Realty
|
In 2019, Digital Realty acquired the site from aircraft manufacturer Airbus Americas for $28 million
|
3.15 miles
|
Equinix Ashburn DC10
|
Equinix sells "Business Suites" at DC10. Business Suites are dedicated rooms rather than retail colocation racks and cages and are intended for deployments larger than 250 kVA.
|
3.16 miles
|
VPLS IAD
|
|
3.16 miles
|
QTS Ashburn (Carpathia)
|
QTS acquired this site via the Carpathia acquisition in 2015
|
3.19 miles
|
Equinix Ashburn DC6
|
|
3.19 miles
|
Equinix Ashburn DC11
|
|
3.19 miles
|
Equinix DC15
|
|
3.22 miles
|
Equinix Ashburn DC12
|
Equinix's DC12 site is logically part of Equinix Ashburn Campus but the building is physically separate and 0.6 miles away.
|
3.24 miles
|
CloudHQ Ashburn Campus
|
|
3.25 miles
|
CloudHQ LC2
|
|
3.26 miles
|
Equinix Ashburn Campus
|
Equinix's Ashburn campus consists of many buildings (table below) arranged in a campus environment. A simple cross-connect will reach any other building on the campus.
|
3.28 miles
|
Equinix Ashburn DC1
|
|
3.28 miles
|
Equinix Ashburn DC2
|
The heart of interconnection in Ashburn
|
3.28 miles
|
Evoque Ashburn WDC1
|
24x7x365 on-site staff
|
3.30 miles
|
44351 Import Plz
|
|
3.34 miles
|
Equinix Ashburn DC5
|
|
3.36 miles
|
Cologix Ashburn ASH1
|
Cologix is planning to construct three data centers totaling nearly 1 million square feet across 22.6 acres at Beaumeade Corporate Park in Ashburn. The company bought the site for $38 million, or $1.68 million per acre, from the Christian Fellowship Church in July 2018.
|
3.37 miles
|
Amazon 44854 Interconnection
|
|
3.37 miles
|
44274 Round Table (Bldg L)
|
|
3.38 miles
|
ANEXIO VA1
|
|
3.38 miles
|
NTT VA1
|
RagingWire’s patented electrical infrastructure offers 2N+2 redundancy -- twice the redundancy of a standard Tier 3 data center.
|
3.38 miles
|
21744 Sir Timothy Drive (ACC10)
|
|
3.39 miles
|
Equinix Ashburn DC4
|
|
3.41 miles
|
Amazon 44858 Interconnection Plaza
|
|
3.42 miles
|
CoreSite Reston VA3
|
As part of VA3 Phase 1B, CoreSite will build the shell of an 80,000 Gross sqft, 12 megawatt building, and a 77,000 NRSF centralized infrastructure building. which will serve the entire VA3 property.
|
3.45 miles
|
44372 Round Table: Digital Realty
|
|
3.45 miles
|
44520 Hastings (ACC3) Digital Realty
|
|
3.46 miles
|
Lumen Ashburn
|
|
3.47 miles
|
Import Plz, Ashburn
|
|
3.48 miles
|
ANEXIO ACC5
|
Anexio acquired the data center from Net Data Centers (Net2EZ) in October 2015.
|
3.48 miles
|
44480 Hastings (ACC4) Digital Realty
|
ACC4 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
3.49 miles
|
44490 Chilum Place: Digital Realty
|
|
3.49 miles
|
QTS Ashburn-Shellhorn DC2
|
|
3.51 miles
|
21745 Sir Timothy (ACC9) Digital Realty
|
|
3.53 miles
|
Amazon 44862 Interconnection Plaza
|
|
3.56 miles
|
44521 Hastings (ACC2) Digital Realty
|
|
3.56 miles
|
ANEXIO Ashburn IAD4
|
|
3.57 miles
|
QTS Ashburn-Shellhorn
|
|
3.57 miles
|
Contegix Reston
|
The Contegix site is on CoreSite's Reston Campus
|
3.57 miles
|
CoreSite Reston Campus VA1 VA2
|
VA1 and VA2 are on Sunrise Valley Drive in Reston. VA2 was built in the parking lot of the original VA1 data center.
|
3.58 miles
|
ServerCentral Ashburn DC3
|
|
3.58 miles
|
Equinix Ashburn DC3
|
Equinix's DC3 site is logically part of Equinix Ashburn Campus but the building is physically on the Digital Realty campus.
|
3.59 miles
|
NTT VA2
|
|
3.59 miles
|
44470 Chillum - Digital Realty
|
|
3.60 miles
|
44521 Hastings (ACC4) Digital Realty
|
|
3.60 miles
|
21625 Gresham (ACC7) Digital Realty
|
ACC7 is part of the legacy Dupont Fabros Ashburn campus
|
3.64 miles
|
Equinix DC13
|
|
3.66 miles
|
44461 Chilum (ACC6) Digital Realty
|
ACC6 is part of the legacy Dupont Fabros Ashburn campus which was acquired from Dupont Fabros in September 2017.
|
3.66 miles
|
Rackspace Ashburn IAD3
|
|
3.66 miles
|
Aligned Ashburn
|
The first building on the Aligned 26-acre campus was launched in September 2019.
|
3.78 miles
|
43780 Digital Loudoun Plaza (Bldg H)
|
|
3.78 miles
|
44060 Digital Loudoun Plaza (Bldg K)
|
|
3.78 miles
|
44100 Digital Loudoun Plaza (Bldg J)
|
|
3.79 miles
|
NTT VA3
|
RagingWire's Ashburn VA3 Data Center is phase one of the massive Ashburn Data Center Campus development which can accommodate six buildings on the 76.5 acre site.
|
3.80 miles
|
Amazon IAD60
|
|
3.81 miles
|
43940 Digital Loudoun Plaza (Bldg G)
|
|
3.81 miles
|
Amazon IAD-67
|
|
3.81 miles
|
Aligned IAD02
|
|
3.85 miles
|
InfoRelay Herndon
|
|
3.85 miles
|
Amazon IAD71
|
|
3.89 miles
|
Amazon IAD50
|
|
3.90 miles
|
NTT Ashburn Campus
|
|
3.94 miles
|
AWS: 20935 Loudoun County Pkwy
|
|
3.96 miles
|
AWS: 20945 Loudoun County Pkwy
|
|
3.97 miles
|
NTT VA5
|
|
3.98 miles
|
43915 Devin Shafron (Bldg A)
|
|
3.98 miles
|
Digital Realty Loudoun Ashburn Campus
|
The Digital Ashburn (Loudoun) Campus is 98 acres and consists of 9 datacenters. There are at least 37 suites within nine buildings on the Loudoun Exchange campus.
|
4.02 miles
|
NTT VA4
|
|
4.03 miles
|
Sabey Intergate.Ashburn
|
Intergate.Ashburn is a purpose-built data center campus on 38 acres
|
4.04 miles
|
43881 Devin Shafron (Bldg B)
|
|
4.12 miles
|
43830 Devin Shafron (Bldg F)
|
|
4.16 miles
|
43831 Devin Shafron (Bldg C)
|
|
4.17 miles
|
Sabey Intergate.Ashburn (Building A)
|
|
4.21 miles
|
43790 Devin Shafron (Bldg E)
|
|
4.26 miles
|
43791 Devin Shafron (Bldg D)
|
|
4.26 miles
|
Amazon IAD-54
|
|
4.28 miles
|
Databank Ashburn IAD1
|
In December 2020, Databank acquired the site from Zayo.
|
4.28 miles
|
FastServ Ashburn
|
|
4.35 miles
|
InfoRelay Reston
|
|
4.36 miles
|
DataBank Ashburn IAD3
|
|
4.64 miles
|
Amazon 13600 EDS Drive
|
|
4.69 miles
|
Visa Eastern US Ashburn
|
Visa completed its new 350,000 square foot data center in October 2008. The Tier IV property features five data center pods of 30,000 sf each
|
4.84 miles
|
Digital Realty Dulles
|
Digital Realty acquired the 424 acre parcel in September 2018 for $236.5 million from the Metropolitan Washington Airports Authority (MWAA).
|
4.96 miles
|
Lincoln Rackhouse 1807 Michael Faraday
|
The facility was constructed in 1982 and was fully renovated in 2008, 1807 Michael Faraday Court is a single-story data center located approximately 20 miles west of Washington, DC and 15 miles east of Ashburn, VA.
|
5.13 miles
|
Evocative: Virginia, IAD1
|
Evocative's Virginia Data Center Facility (IAD1) is located at 1807 Michael Faraday Ct, Reston, VA. The facility offers 25,000 sq ft (2,322 sq m) of total floor space and a maximum power capacity of 2.2MW.
|
5.13 miles
|
VPLS DC1
|
The site is expandable to 53,000 sqft and 5.7 MW of capacity.
|
5.24 miles
|
ANEXIO Reston
|
|
5.24 miles
|
1780 Business Center Drive (VA3) Digital Realty
|
This site was originally operated by Dupont Fabros as VA3 before being acquired in Sept 2017 by Digital Realty
|
5.53 miles
|
CyrusOne Sterling IX
|
|
6.03 miles
|
Amazon 25020 Willard Road
|
|
6.03 miles
|
Amazon Willard Road (Land)
|
|
6.13 miles
|
Amazon 25420 Sutton Bay
|
|
6.26 miles
|
Amazon 25410 Sutton Bay
|
|
6.27 miles
|
Amazon 25430 Sutton Bay IAD150
|
|
6.32 miles
|
IBM Softlayer Chantilly WDC01
|
|
6.35 miles
|
Lafayette Center Drive Campus - Digital Realty
|
In 2010, DRT acquired this site from 365 Main. The transaction included 4 other data centers and was for a total of $725 Million.
|
6.38 miles
|
Penzance: Chantilly Premier
|
Real estate investment firm Penzance is planning to develop this lot that is adjacent to Ourisman Chantilly Toyota. Construction timelines have not been confirmed.
|
6.46 miles
|
Amazon Fadeley I
|
|
6.54 miles
|
Amazon Fadeley II
|
|
6.55 miles
|
Amazon IAD9
|
|
6.60 miles
|
Amazon Fadeley III
|
|
6.63 miles
|
Amazon IAD-63
|
|
6.66 miles
|
Amazon Prediction Lane
|
|
6.68 miles
|
Amazon IAD1
|
|
6.69 miles
|
Amazon IAD61
|
|
6.69 miles
|
Amazon IAD22
|
|
6.98 miles
|
Google Dulles Arcola Center
|
|
7.10 miles
|
Google: Arcola 2
|
|
7.44 miles
|
PowerHouse Arcola
|
|
7.83 miles
|
Compass Loudoun County
|
|
7.95 miles
|
Yondr Arcola, VA
|
The campus's first building was delivered in late 2023.
|
8.03 miles
|
Amazon 41992 John Mosby Highway
|
|
8.17 miles
|
Vantage VA3 Campus
|
Located on 134 acres, the campus will feature seven multi-story facilities with 288MW of capacity across more than 2 million square feet.
|
8.30 miles
|
Microsoft IAD11
|
|
8.32 miles
|
Google Leesburg Stonewall Park
|
|
8.37 miles
|
Microsoft Aldie
|
|
8.40 miles
|
Penzance: Chantilly, VA
|
Penzance is looking to develop a data center in Chantilly, VA, spanning 402,000 sq ft (37,350 sqm) across three stories.
|
8.81 miles
|
TA Realty: Leesburg
|
In November 2023, TA Reality announced that the entire 5 building campus would be leased to a large hyperscaler.
|
9.99 miles
|
Equinix Vienna DC8
|
|
10.19 miles
|
Microsoft Leesburg 1A
|
|
10.54 miles
|
Stack: Northern Virginia, NVA06
|
Data center firm Stack Infrastructure announced a new 72MW campus in Leesburg. The two buildings will total around 620,000 sq ft (57,600 sqm).
|
11.12 miles
|
Cogent Vienna
|
|
11.16 miles
|
8100 Boone - Digital Realty
|
|
11.59 miles
|
Equinix Vienna DC7
|
|
11.59 miles
|
DataBank McLean IAD2
|
|
11.63 miles
|
Element Critical VA1
|
|
11.64 miles
|
Lumen McLean 1
|
|
12.07 miles
|
XO Fairfax
|
|
13.81 miles
|
AOL: 7777 Infantry Ridge
|
|
13.89 miles
|
Equinix Manassas DC14
|
|
15.16 miles
|
Amazon 7500 Bethlehem
|
|
15.26 miles
|
Amazon IAD7
|
|
15.30 miles
|
Amazon IAD24
|
|
15.36 miles
|
Amazon IAD11
|
|
15.46 miles
|
Amazon IAD-59
|
|
15.52 miles
|
Amazon IAD-52
|
|
15.59 miles
|
Amazon IAD14
|
|
15.95 miles
|
Corscale: Gainesville Crossing
|
|
15.99 miles
|
Amazon: 8190 Bethlehem
|
|
16.01 miles
|
CorScale: Gainesville Building 2
|
US data center firm CorScale has started work on the second facility at its Gainesville campus in Virginia’s Prince William County. The two-story Building 2 at the campus will total 288,000 sq ft and offer 72MW.
|
16.05 miles
|
Amazon Bethlehem Technology Park DC18
|
|
16.08 miles
|
Amazon Bethlehem Technology Park DC19
|
|
16.09 miles
|
Amazon Bethlehem Technology Park DC20
|
|
16.28 miles
|
Iron Mountain: VA-7
|
Iron Mountain is developing a data center on 24 acres of land northeast of the Prince William Parkway and Sudley Manor Drive intersection and west of Bethlehem Road.
|
16.30 miles
|
Iron Mountain Northern Virginia (Manassas)
|
Announced in March 2016, Iron Mountain’s Manassas data center in Prince William County will include four buildings totaling 915,000 square feet and 60 MW of power. The campus is 83 acres.
VA-1, the first building on the campus, is a 165,000Sqft facility with 12.4 MW of power.
|
16.31 miles
|
Iron Mountain: VA-3
|
Iron Mountain continues to grow it's Virginia campus. VA3 is the third and largest building on the Virginia campus over 165,000 sqft and includes two 48 MW data center halls at 30,000 SF each.
|
16.33 miles
|
Iron Mountain VA-2
|
|
16.33 miles
|
Microsoft: Gainesville, VA
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
16.39 miles
|
Iron Mountain: VA-4
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA4 is the fourth building on the Virginia campus over 165,000 sqft of space. The facility will house 32 MW of critical load on completion.
|
16.44 miles
|
Microsoft : Gainesville 2
|
Microsoft Corp. recently acquired 124 acres across two parcels at 13490 University Blvd. and 5941 Wellington Road. University Boulevard site is seeking an allowance for up to nearly 4 million square feet of data centers and a new electric substation.
|
16.45 miles
|
Iron Mountain: VA-5
|
Iron Mountain continues to grow it's Virginia campus at 11560 Hayden Rd, Manassas. VA5 is the fifth building on the Virginia campus over 165,000 sqft of space. The facility will house 40 MW of critical load on completion.
|
16.50 miles
|
Opus Interactive Manassas
|
|
16.59 miles
|
Amazon IAD-73
|
|
16.59 miles
|
Amazon IAD-74
|
|
16.65 miles
|
Stack: NVA05B
|
STACK Infrastructure is constructing a new data center facility at9001 Freedom Center Blvd, Building B in Manassas, with a substantial footprint of 340000 square feet.
|
16.72 miles
|
9020 Freedom Center
|
|
16.73 miles
|
Amazon: 5945 Wellington
|
AWS has proposed the site for a 2.2 million sqft data center campus on approximately 117 acres.
|
16.81 miles
|
9040 Freedom Center
|
|
16.89 miles
|
NTT Gainesville VA Campus
|
|
16.91 miles
|
Stack: Northern Virginia NVA05
|
STACK Infrastructure's NVA05A offers 36MW of flexible capacity within its 262,000 sq. ft. building in Northern Virginia.
|
17.07 miles
|
QTS Manassas DC1
|
|
17.21 miles
|
QTS Manassas DC5
|
|
17.22 miles
|
Yondr Bristow Campus
|
|
17.34 miles
|
QTS 10680 University Blvd
|
|
17.52 miles
|
Amazon IAD-55
|
|
17.65 miles
|
Amazon: 15455 John Marshall
|
|
17.71 miles
|
Amazon 15465 John Marshall
|
|
17.76 miles
|
8217 Linton Hall (VA4) Digital Realty
|
|
17.88 miles
|
CloudHQ Manassas Hornbaker
|
Built in 2010, The site was previously known as COPT-6. There is a 100,000 SF raised floor data area, divisible in bays of 6,250 SF
|
17.88 miles
|
Amazon IAD-77
|
|
17.88 miles
|
VAZATA Northern Virginia (NoVa One)
|
|
17.88 miles
|
Evoswitch USA WDC 1
|
|
18.02 miles
|
Stack: NVA02D
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building D in Manassas, with a substantial footprint of 280,000 square feet.
|
18.05 miles
|
Stack: NVA02C
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building C in Manassas with a substantial footprint of 15000 square feet.
|
18.05 miles
|
Amazon: 11150 Thomasson Barn
|
|
18.07 miles
|
AWS 10261 Tanner
|
|
18.09 miles
|
Amazon: 11200 Thomasson Barn
|
|
18.11 miles
|
Stack: NVA02B
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building B in Manassas with a substantial footprint of 227,000 square feet.
|
18.13 miles
|
Stack: NVA02E
|
STACK Infrastructure is constructing a new data center facility at 9750 Hornbaker Road, Building D in Manassas, with a substantial footprint of 280,000 square feet.
|
18.19 miles
|
Stack: Northern Virginia, NVA02
|
Data center firm Stack Infrastructure isData center firm STACK Infrastructure's NVA02 campus in Prince William County will house at least seven data centers, offering 420MW of power capacity for scalability.
|
18.19 miles
|
AWS IAD 101
|
|
18.20 miles
|
AWS 10281 Tanner Way
|
|
18.31 miles
|
AWS IAD 100
|
|
18.87 miles
|
XO (4301 Connecticut)
|
|
18.95 miles
|
CloudHQ MCC2
|
|
19.19 miles
|
CloudHQ Manassas MCC1
|
CloudHQ built eight miles of fiber conduit along Route 234 to bring connectivity to the campus. Fiber providers on the campus are FiberLight, Verizon, Level 3, Zayo, CenturyLink, Qwest, and AT&T
|
19.36 miles
|
CloudHQ MCC3
|
|