Aligned Salt Lake City

3333 West 9000 South

░░░░░░░ Login to view SqFt Total Building Size

░░░░░░ Login to view SqFt Gross Colocation Size

░░░░ Contact Us to subscribe to our data service MW Total Power

Show SqM

Operated by:

Situated on 60 acres, including a dedicated on-site substation, the former Fairchild Semiconductor chip fabrication facility is being renovated to become a colocation data center delivering 50 MW of critical capacity.

Initial Data Center Phase

The site will initially provide a 75,000 square foot data hall, 15,000 square feet of rentable office space, and 9,700 square feet of technical burn-in and storage space. The building also will have a dedicated loading dock, conference rooms, drop-in office pods, a café area, and shower facilities on site.

Second data center on the campus:

Building on Aligned’s existing 34 MW, 300,000 sq. ft. West Jordan data center, the adjacent new 240,000-sq.-ft. facility will add 48 MW of capacity. At full build, the master-planned Aligned SLC campus will offer 780,000 square feet of space and 130 MW of capacity

Map and Nearby Locations:

3333 West 9000 South
Click Map to begin Search

Sites within 15 miles of Aligned Salt Lake City

Show SqM
Distance Site About
0.19 miles Aligned SLC-02
0.30 miles Aligned SLC-03
2.50 miles Flexential Salt Lake (South View)
3.15 miles Cirrus DS View 78
Announced in July 2017, the Cirrus Data Services View 78 Campus is under construction. The first phase will support 224,000 sqft and a critical IT load of 32 MW. At full capacity, the campus will expand to 160 MW and over 1 million square feet.
3.49 miles XO: 8871 South Sandy
4.13 miles Novva South Jordan Campus
4.36 miles eBay South Jordan Topaz
The first phase of eBay's Topaz project is a 240,000 square foot building housing three 20,000 square foot data center halls
4.58 miles Aligned: SLC05
7.48 miles Edged Energy: Bluffdale, UT
Two buildings are planned for the site
8.00 miles DataBank SLC6
8.00 miles DataBank SLC4
8.03 miles DataBank SLC5
8.07 miles DataBank SLC3
8.09 miles DataBank SLC2
he facility has access to more than 8MW of high-density power, and redundant cooling systems maintain optimal temperatures for data center equipment. Situated in a highly secure technology park, the facility is protected by a full perimeter fence encompassing the building, parking areas, loading docks, and all customer entrances.
8.09 miles DataBank Bluffdale Granite Point Campus
DataBank’s Granite Point West Data Center is strategically located in Bluffdale, UT, minutes from downtown Salt Lake City. With a carrier-neutral design, the 95,000 sqft building has over 55,000 sqft of raised-floor space for customer equipment and offers network connectivity to multiple Tier 1 and Tier 2 providers. Diverse substations provide more than 11MW of high-density power, while redundant cooling systems maintain optimal temperatures for data center equipment.
8.36 miles Flexential Salt Lake (Mill Creek)
9.09 miles Flexential Salt Lake (Cottonwood)
9.35 miles EdgeConneX Salt Lake
Within 5 miles from downtown SLC and 3 miles from SLC International Airport
9.35 miles Voonami Salt Lake City SLC2
9.36 miles Flexential Salt Lake (Presidents)
9.73 miles Aligned SLC-04
11.13 miles NSA Utah Data Center
11.79 miles Lumen Salt Lake 1
11.83 miles Flexential Downtown Salt Lake (Delong)
11.95 miles Lumen Salt Lake City 4
12.75 miles Flexential Salt Lake (Fair Park)
12.80 miles XMission 51 E 400 S
12.90 miles Flexential Salt Lake (SingleEdge)
13.36 miles DataBank SLC1
DataBank’s Downtown Salt Lake City data center is a multi-tenant colocation facility located in the heart of the downtown business district. The site is the primary carrier-hotel for the Salt Lake City area and is highly populated with a number of prominent Tier-1 and Tier-2 network providers which enter the building through multiple diverse points. The site was formerly operated by C7 before the Databank acquisition.
13.43 miles Unisys Salt Lake City
Unisys's Salt Lake City data center supports multiple Unisys business functions for IT Managed Services
13.63 miles Lumen Salt Lake 2
17.35 miles C7 Lindon (Timpanogos)
18.89 miles Tract: Eagle Mountain, Utah
Tract is planning a large new data center park in Eagle Mountain, Utah. The company has completed the acquisition of more than 668 acres of land in Eagle Mountain.

Aligned Salt Lake City Data Center Photos


Construction progress as of June 2020 on Aligned's 2nd facility in SLC

Rendering of Aligned two-building SLC Campus

Operating Company

Aligned Data Centers is an infrastructure technology company that offers colocation and build-to-scale solutions to cloud, enterprise, and managed service providers.

In early 2022, Aligned Energy was rebranded to Aligned Data Centers.

19 Facilities Owned
7 Markets Served
593.0 Megawatts
View Company