Building

  • Year built: 1988 (Data Centre built in 2014)
  • Number of floors: 7 floors
  • Structure type: Concrete & Steel
  • Seismic Rating: UBC Seismic Zone zero
  • Ceiling Clearance (facility): 13’ 8”
  • Size: 112,000 Sq. Ft.
  • Data Center space: 60,000 Sq. Ft.
  • Meet-Me-Rooms: Two Meet-Me-Rooms served by diverse conduits banks to maintain full diversity of all fibre runs
  • Freight elevator: 10’ Height clearance
  • Access: Easily accessible with large loading dock area that is on a side street away from traffic

Building Power

  • 10 MVA, 2 pilot wire feed from Ontario Hydro via the Strachan Substation (approx. 900 meters away)
  • An additional 2 pilot wire feed from the Strachan Substation is planned for 2015 (will then total (x2) 2 pilot wire feeds with additional power capacity)
  • N+1 backup power generation
  • 11 Diesel generators on site
  • Generators consist of (x8) 400KW, (x1) 800KW, and (x2) 1600KW units
  • Ten seconds to transfer critical load from utility to the generators
  • 26,000 Liter main fuel storage tanks

Map and Nearby Locations:

905 King St W
Click Map to begin Search

Sites within 15 miles of 905 King Street W

Show SqM
Distance Site About
0.00 miles Contegix Toronto
0.00 miles Cologix Toronto TOR2
Cologix’s second Toronto data centre site at 905 King Street (TOR 2) was built using standards for concurrent maintainability for space, power, mechanical systems and security. The TOR 2 data centre can be utilized as a stand-alone, diverse bypass facility to Cologix's TOR 1 data centre at 151 Front Street.
0.00 miles Beanfield 905 King St
0.68 miles Beanfield 23 Fraser
1.22 miles 250 Front Street - Allied
Also known as the Canadian Broadcasting Centre, the building is a block away from Allied's carrier hotel, 151 Front Street.
1.42 miles Neutral Data Toronto
1.42 miles Cologix Toronto TOR1
Cologix operates seven discrete Toronto data centres at 151 Front Street West (TOR 1), Canada’s largest and most important carrier hotel.
1.42 miles Equinix Toronto TR1
Equinix's facilities in Toronto has a long history that includes several acquisitions. The original suites now operated by Equinix at 151 Front Street began with RACO, a Canadian company that Switch and Data acquired in 2004.
1.42 miles eStruxture TOR-1
1.42 miles Priority Colo TOR1
1.42 miles 151 Front Street
151 Front Street is Canada's largest carrier hotel, where the telecom, Internet service providers, and content companies colocate to exchange traffic (peer) between their respective networks.
1.42 miles Digital Realty 151 Front
1.46 miles eStruxture TOR-2
1.52 miles CenriLogic Toronto
1.53 miles Equinix Toronto TR4
The site was formerly known as "Q9 Toronto 2, 3, and 4" which were acquired by Equinix from Bell Canada in 2020.
1.66 miles TNW Toronto
2.59 miles Urbacon Toronto - 281 Front Street
At the intersection of Front Street East and Parliament Street, 281 Front is less than one and a half kilometres from Canada’s financial heart, and directly abutting 151 Front Street, which is Toronto's carrier hotel.
2.60 miles Equinix Toronto TR2
TR2 is also known as Parliament Street Data Centre TR2 has metro connections to TR1, which is home to one of Canada's largest financial trading ecosystems. TR2 hosts Internet Exchange, Ethernet Exchange and Equinix Cloud Exchange™ connectivity to TR1.
5.53 miles Canada15Edge Toronto West
6.46 miles Compass Toronto Etobicoke
6.83 miles eStruxture TOR-3 (Etobicoke)
7.09 miles Lumen Toronto 1
8.17 miles Stack: TOR01C
Stack Infrastructure's TOR01C facility is just seven miles away from 151 Front Street. The third phase will offer 24MW to support client growth on a campus tailored as a purpose-built solution for scalability.
8.25 miles STACK Toronto TOR01
Stack Infrastructure's TOR01 Campus is just seven miles away from 151 Front Street, Toronto's largest carrier hotel and primary internet exchange point. Toronto-based developer First Gulf partnered with STACK to deliver the initial 8MW data center by renovating an existing building TOR01A.
8.25 miles Stack: TOR01B
Stack Infrastructure's TOR01B facility is just seven miles away from 151 Front Street. The 24MW phase of development features committed power from Toronto Hydro from three diverse substations using 100% renewable energy sources.
8.34 miles ServerFarm Toronto TOR1
Site is approximately 7.14 acres Three 10,000 SF data halls with ample office and conference space
8.46 miles ILAP 210 Sheppard
9.10 miles Cogent Mississauga
9.48 miles Canada Cloud Data Centre
9.83 miles TeraGo Mississauga
10.16 miles Compass: North York
11.45 miles 1 Century Place (TOR1) Digital Realty
This site was originally operated by Dupont Fabros as TOR1 before being acquired in Sept 2017 by Digital Realty Trust in a $7.6 Billion 12 datacenter deal. Located just outside the city of Toronto in nearby Vaughan, this Canadian wholesale data centre spans over 66,000 square metres (711,000 square feet) with a critical power capacity of up to 46 megawatts. The site was the former Toronto Star Printing plant.
11.67 miles CentriLogic Mississauga (South)
12.11 miles Edgeconnex Toronto
12.74 miles Excell IT
12.92 miles CentriLogic Mississauga (North)
18″ raised floor with hot/cold aisle configuration 24/7/365 Security & Multi-level Biometric Access Control
13.07 miles TeraGo Vaughn
13.38 miles Nüday Networks
14.19 miles Rogers Markham TOR DC3
14.27 miles Priority Colo TOR2
14.30 miles 371 Gough - Digital Realty
The site will support (5) 1,350 kW data center suites measuring approximately 10,000 sq. ft. each
14.46 miles Cyxtera Markham TR3
14.69 miles Equinix Markham TR5
14.86 miles 1547 Ontario TOON1
The building was sold to 1547 Critical Systems Realty in 2018. As part of the deal, 1547 will handle wholesale deals in the building. While I.C.E will manage all the retail colocation deployments.
14.86 miles Cologix TOR4
Close to downtown Toronto in Markham, the Scalelogix TOR4-S data center has diverse dark fiber connectivity between TOR4-S and TOR1 at 151 Front Street
15.09 miles eStruxture TOR-4 Scarborough
15.15 miles Pathway Communications
16.77 miles Equinix Brampton TR6
16.85 miles Equinix Brampton TR7
The site was formerly known as "Q9 Toronto Two" which was acquired by Equinix in 2020 from Bell Canada.
16.88 miles Urbacon - Richmond Hill, ON
17.40 miles Cyxtera Mississauga TR1
One story building Raised floor (inches) = 24 and 30

905 King Street W Data Center Photos


McQuay Cooling System
Source: Beanfield

Generators on the Roof
Source: Beanfield
Bring on the carriers
Meet Me Room Racks

Bring on the carriers


Loading Docks at 905

Operating Company

Allied Properties is a REIT which develops, owns and manages buildings in Canada. Allied owns 151 Front Street, a primary telecom hotel in Toronto.

Allied owns and manages a portfolio of mainly Class I office properties in the urban areas of Montreal, Ottawa, Toronto, Kitchener, Calgary, Edmonton, and Vancouver.

3 Facilities Owned
0 Markets Served
7.7 Megawatts
View Company

News

Read More News