11900 E Cornell

11900 E Cornell Ave

░░░░░░░ Login to view SqFt Total Building Size

░░░░░░░ Login to view SqFt Gross Colocation Size

░░░░ Contact Us to subscribe to our data service MW Total Power

Show SqM

Operated by:

In 2020, Digital Realty Trust sold the building to Mapletree Industrial Trust.

The site is fully leased to Flexential.

Building History:


pre-2006 The site was an AT&T office
2006 DCI Technology Holdings acquired the site [r1]
2012 Digital Realty Trust acquired the site. [r2]

References:


r1. DCK link
r2. DCK link

Map and Nearby Locations:

11900 E Cornell Ave
Click Map to begin Search

Sites within 15 miles of 11900 E Cornell

Show SqM
Distance Site About
0.00 miles Flexential Aurora (Cornell)
15,000 kVA UPS system capacity Redundant battery strings with monitoring Branch Circuit Monitoring
1.97 miles Lumen Denver 5
3.71 miles H5 Denver
The data center campus sits on more than 12-acres in the Denver Tech Center and is comprised of four buildings totaling nearly 300,000 square feet.
4.33 miles Charter Communications National Center West
4.64 miles Flexential Denver (Arapahoe)
4.84 miles DataBank Centennial (DEN2)
The site at 6900 South Peoria Street in Centennial, CO is air-containment optimized and has a reflective white roof that prevents solar heat from entering the building. Inside, energy efficient “green” cooling solutions are engineered to achieve an industry-leading PUE of 1.3.
4.92 miles DataBank Centennial II (DEN5)
5.12 miles Comcast Centennial
5.13 miles XO: 9706 Easter
5.28 miles Equinix Denver DE1
This site is a former Switch and Data site before Equinix acquired S&D in 2010.
5.53 miles Expedient Centennial
6.63 miles XO: 313 Inverness
6.76 miles DataBank Englewood (DEN1)
6.97 miles Equinix Denver DE2
Equinix acquired DE2 in Englewood as well as 28 other datacenters from Verizon in May 2017. It was formerly named Verizon DEN1.
7.00 miles Cyxtera Denver DEN2
7.00 miles 8534 Concord - Digital Realty
Digital Realty has leased out the building to Cyxtera's DN3 site.
7.02 miles EdgeConneX Denver
Capable of 20+kW per cabinet Capable of 600+ watts per sq ft Real-time branch circuit monitoring
7.02 miles TerraCom Direct Denver
TerraCom Direct's Denver Colorado site is located in the ViaWest Compark Data Center Complex.
7.07 miles Flexential Englewood
The Englewood site is also known as Flexential's Compark Data Center. Englewood is Flexential's largest site in Denver.
7.09 miles OneNeck Denver
The Denver One Neck data center was built in 2015 at a cost of $20 million. Phase I provides 35,000 Square Feet, but facility can be built out to 160,000 Square Feet over 5 phases.
7.13 miles JP Morgan Aurora
7.78 miles Hosting.com Denver
Located in the heart of Denver, the HOSTING N+1 data center is housed in a historic Ford Model T factory.
8.42 miles 365 Aurora, CO
8.66 miles QTS Denver
8.69 miles Lumen Aurora 1
9.00 miles CoreSite DE2
This is the legacy Comfluent Denver 2 site that is adjacent to the Level 3's Denver gateway site
9.02 miles Lumen Denver 1 (1850 North Pearl)
9.55 miles Handy Networks Denver
Handy Networks is centrally located Denver, Colorado and operates their own private, fully redundant data center with 24×7, 100% US based technical support.
9.66 miles Flexential Denver (Champa)
9.66 miles DataBank Denver DEN3
9.66 miles 1500 Champa
9.71 miles VLEC Denver
9.71 miles CoreSite Denver DE1
Acquired from Comfluent, data center has the acted as the defacto building Meet-Me Room until 910Telecom set up its own MMR.
9.71 miles Denver Gas & Electric Building (910 15th)
Built in 1910, the Denver Gas & Electric Building (DGEB) at 910 15th is Denver's Carrier Hotel.
9.71 miles Lumen Denver 2 & 3
9.71 miles RockyNet Denver
10.21 miles Iron Mountain DEN-1
Iron Mountain acquired the building from Fortrust in July 2017 for $130 million.
10.39 miles 501 Wazee
900 kVA UPS system capacity Redundant battery strings Multiple redundant power distribution paths Branch Circuit Monitoring System
10.73 miles Visa Central US Denver
11.44 miles American Tower: Denver
12.42 miles Cyxtera Denver DEN1
12.57 miles Microsoft: Denver, CO
Microsoft has bought an undeveloped piece of land directly south of Denali Logistics Park. The 420-acre logistics and industrial park, has the ability to develop buildings that are up to 1.1 million square feet in size and can build up to 6 million in square feet total.
14.44 miles Lockheed Martin Denver
15.23 miles Colorado Colo
19.10 miles 12121 Grant Street
19.40 miles Google Denver Thorton
19.70 miles DataBank Westminster DEN4
Originally built by Stream Data Centers, Zayo acquired the facility in 2017.

11900 E Cornell Data Center Photos

Operating Company

19 Facilities Owned
0 Markets Served
31.5 Megawatts
View Company

News

Read More News